Case Studies

"...all the contractors on the job have been handpicked for their experience, the skills and knowledge they can bring to the project and their proven ability to deliver a quality result on time and within budget. Kimpton ticks all of these boxes which is why we were confident in appointing them."

Marcus Worthington

Travelodge Liverpool

Leisure

Kimpton have a wealth of experience working on high profile, fast turnaround projects that require excellent cost control, attention to detail and completion within tight time frames.

 

Travelodge, The Strand, Liverpool

 

Travelodge, The Strand, Liverpool

TLodge Liverpool

The Client

Travelodge was the first budget hotel brand to launch in the UK back in 1985 and the company now operates 380 hotels (over 26,000 rooms) in Ireland, Spain and the UK. Six and a half million people stayed with Travelodge last year and the chain now employs 5,500 staff. The hotel chain is growing rapidly with plans to operate 70,000 rooms (approximately 1000 hotels) by 2020. The company also aims to be the biggest hotel operator in London by the 2012 Olympics.

The Challenge

One of Travelodge's latest developments is a 141-room waterfront hotel in Liverpool, which is being constructed on the site of a derelict former car park on The Strand. The area is very densely built up and the site is on one of Liverpool's main through-routes. As a result, Kimpton must not only design and install high quality M&E services on time and within budget to meet the needs of the scheme but the firm must also overcome the inherent challenges of the location and the very tight site on which the hotel will sit.

The Solution

The M&E design and installation project includes heating to all bedrooms, air conditioning and ventilation in the public areas, including the hotel's reception and café/bar areas, plus all the development's domestic water and drainage services. Kimpton has also designed the ventilation provision for the kitchen and bedrooms which comprises a natural air intake and mechanical extraction system. The company will also design and install all the electrical services for the building, including the fire alarm system, the disabled refuge system, lightening protection and the UPS system for the lifts.

back to top

 

Tweets

News

  • Dont Gamble with your Building Services
    Posted 26/11/2012

    Can you afford to take a risk with your M&E building services? Have you ever thought that you could save money but just bought yourself a headache? Kimpton Building Services have 50 years experience of designing, installing, commissioning and maintaining mechanical service installations.

    See Article
  • Practice What You Preach
    Posted 22/11/2012

    Following the recent Microgeneration Certification Scheme (MCS) accreditation Kimpton Building Services have introduced a number of energy saving initiatives at their head office in Bromborough.

    See Article

Quick Enquiry

If you have a project or a have an interest in one of our services, please conplete our quick enquiry form and one of our team members will be in touch.

Residential
Test
Working on inner city, fast track projects Kimpton's have a wealth of experience in overcoming the challenges presented by the tight timescale... Find Out More
Office
Properties and office developments present a range of challenging environments with. Kimpton has a proven track record across a range of new b... Find Out More
Leisure
Kimpton have a wealth of experience working on high profile, fast turnaround projects that require excellent cost control, attention to detail... Find Out More
Acoustics
Combining 100 years of industry experience with state-of-the-art design facilities, Kimpton Acoustics is able to address the most complex nois... Find Out More
Data Centres
The very high specification climate control requirements of an IT data centre or clean room environment require detailed knowledge of speciali... Find Out More
Renewables
"Kimpton Renewable Energy Systems understands that successful use of renewable technology requires a solutions-driven approach, not just an off-the-shelf installation. Find Out More